1. Preparatory Work
Inspect materials and components: Ensure that all the gate valve components used for assembly (such as the valve body, valve stem, valve cover, etc.) are in good condition without any damage.
Clean components: Ensure that the surfaces of all components are clean, free of impurities or dirt.
2. Automatic assembly process
Component positioning: Use the mechanical hand or conveyor belt to position each component at the assembly position.
Valve body installation: Fix the valve body on the assembly platform.
Valve stem installation: Automatically insert the valve stem into the valve body and fix it with bolts to ensure smooth movement of the valve stem.
Valve cover installation: Connect the valve cover to the valve body, tighten the bolts, be careful not to tighten too much to avoid damaging the sealing surface.
Pipeline connection: According to the actual situation, automatically connect the inlet and outlet pipelines, and use gaskets to ensure a good seal at the connection point.
3. Quality Inspection
Operation test: Rotate the valve stem to open or close the valve, ensuring that the valve can move freely.
Leak detection: When the valve is closed, use a pressure gauge or leak detector to check if the valve is leaking.
Pressure test: Conduct a pressure test or flow test to ensure that the valve can work properly.
4. Finished product packaging
Clean the valve: Automatically clean the inside and outside of the valve to ensure its normal operation.
Packaging: Package the gate valves that have passed the inspection, preparing them for shipment.